User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 16 Ver 1.2.0
Figure 11 Firmware burning interface 1 for EVK daughter board
First click the “Select Project Folder” button and select the target project folder
(i.e. the project under “platform”) in the pop-out window. The selected project path
will be available in the box next to the “Select Project Folder” button; test script and
product configuration information files will be available in the “test.tls” and
“product.ini” editing window, respectively.
Figure 12 Firmware burning interface 2 for EVK daughter board
test.tls
product.ini