User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 15 Ver 1.2.0
3.2 Firmware burning for EVK daughter board
EVK daughter board should be burned with firmware before it’s ready for use.
First connect the EVK daughter board with PC via an USB cable, as shown in
Figure 10.
Figure 10 Connection chart between EVK daughter board and PC
Then double click the “EvkMonitor.exe” under the
“System_V3.0_xxx\Script\Monitor” folder.
Click “download” under the menu “Evk” to open the burning interface.
Connect EVK with PC via USB cable
EVK