User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 13 Ver 1.2.0
Double click “tlsr8266f512et32_1x1Jig_2in1” to open the following interface.
test.tls: Jig test script to determine PCBA test items.
product.ini: EVK product information to determine PCBA RF test frequency point
and ID.
boot.bin: Image file to download into PCBA finally.
2) uart: Double click “uart.bat” to open uart window and display real-time log for
the convenience of test status check. Only one uart window is allowed at the
same time.
3) conti_test_uart.bat: Double click the file, a uart window will pop up; data won’t
be available on the window, but only saved in “log.txt” under this directory for
convenience of analysis.