User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 12 Ver 1.2.0
3 Firmware Burning For EVK Daughter Board
3.1 Folder structure for Test Bench Firmware
Telink test bench firmware folder is generally named as “System_V3.0_xxx”.
The structure of the “System_V3.0_xxx” folder is shown as below:
“DB”: This folder contains db files.
“Sch”: This folder contains schematics, cable connection illustration, and etc.
The structure of the “Script” folder is shown as below:
1) platform: This folder contains project files.
E.g.
1
2
3
4