User's Manual
Table Of Contents
- 1 Overall Architecture Of 1x1 Test System 2.1
- 2 Hardware Platform Building
- 2.1 Check External Antenna
- 2.2 Cable connection
- 2.2.1 Connection points on EVK daughter board
- 2.2.2 Cable connection between EVK daughter board and PCB antenna
- 2.2.3 Cable connection between EVK daughter board and buzzer
- 2.2.4 Cable connection between EVK daughter board and Mechanical structure
- 2.2.5 Cable connection between EVK daughter board and DUT
- 2.2.6 Other cable connection
- 3 Firmware Burning For EVK Daughter Board
- 4 Observe Test Result Via PC Software EvkMonitor
- 5 Update PCBA (DUT) Firmware
- Appendix 1 Test Item List On PC Software “EvkMonitor”
- Appendix 2:Hardware List
- Appendix 3:Dimension chart of EVK daughter board and buzzer board
Assembly And Maintenance Manual for Telink Test System 2.1
AN-16052600-E3 10 Ver 1.2.0
2.2.5 Cable connection between EVK daughter board and DUT
Table 3 shows the connection correspondence between EVK daughter board
and DUT.
Table 3 Cable connection between EVK and DUT
Connection points on EVK daughter board
Connection points on DUT
3V3DUT
BAT+
GND
BAT-
SWM
SWS (DUT)
If the DUT is a remote control board, it’s also needed to connect wakeup pin of
the DUT with PIN45 of the EVK board.
EVK
Mechanical Structure
Button
+ -
Red LED
+ -
White LED
+ -
Yellow LED
+ -
Green LED
+ -
PIN48
GND
PCB Antenna
GND
Buzzer
3V3B
VCC
GND
Figure 8 Cable connection chart