Owner manual

3 Installation Model 3000MA
3-10
Teledyne Analytical Instruments
Figure 3-7: FET Series Resistance
3.4 Testing the System
Before plugging the instrument into the power source:
Check the integrity and accuracy of the gas connections. Make
sure there are no leaks.
Check the integrity and accuracy of the electrical connections.
Make sure there are no exposed conductors.
Check that sample pressure is between 3 and 15 psig, according
to the requirements of your process.
Power up the system, and test it by performing the following
operations:
1. Repeat the Self-Diagnostic Test as described in chapter 4, section
4.3.5.