User guide

2 Installation Model 2010A
2-8: Part II Teledyne Analytical Instruments
the system is ready to test. Before plugging either of the units into their
respective power sources:
Check the integrity and accuracy of the gas connections. Make
sure there are no leaks.
Check the integrity and accuracy of the electrical connections.
Make sure there are no exposed conductors
Check that sample pressure is between 3 and 40 psig, according
to the requirements of your process.
Power up the system, and test it as follows:
1. Repeat the Self-Diagnostic Test as described in Part I, chapter 4,
section 4.3.5.