Users Manual User Manual
Current Measurement (Optional)
164
To start test, click Run. This opens a reminder prompt to make sure that the
initial test setup is in place.
Click OK to continue the test. A flashing prompt asks you to connect the
Standard Load #2 to the Analyzer.
Once the Standard Load #2 has been connected the test proceeds to display
the measurement result.
Figure 125 VBus Droop Test Result