User Manual

Performance Ver
ication
Preparation
This setup is identical to the network analyzer setup in the main procedure, except that the synthesizer and spectrum
analyzer replace the network analyzer.
Allow all test equipment to warm up for 20 m inutes in an environment that is within the environmental conditions listed in
the specications section.
Prepare the equipment as follows:
1. Connect a BNC cable to the input of the spectrum analyzer and the other end of the cable with a BNC-to-Type N
coaxial adapter to the output of the 1103 power supply.
2. Connect a BNC cable from the output of the synthesizer and the other end of the cable with a BNC-to-Type N c oaxial
adapter to the input of the 1103 power supply.
Perform the verication procedures in order.
38 P6250 & P6251 Technical Reference