Install Instructions

© 2011 D 316 - 05/11 8 of 12
Description: tN4 Wiring Center 316, four tekmarNet
®
4 Thermostats, and four zone pumps wired into a powered boiler
demand input on a device such as a tekmar Boiler Control 260 which controls the boiler and DHW pump.
R
C
L
N
Demand
Boiler
115 V (ac)
LNG
(red)
(black)
(black)
(black)
(black)
to pump
grounds
Zone 2
Zone 3
Zone 4
Zone 1
Zone Power (L)
Zone 1
Zone 2
Zone 3
Zone 4
Strip wires
1/2 inch (13 mm).
Installed wires are
not removable.
12-18 AWG
316
Power
Zone 1
Zone 2
Zone 3
Zone 4
End Switch
C
Zone 2
WtN4 R C
Zone 3
WtN4 R C
Zone 4
WtN4 R
tN4 Wiring Center 316
Four Zone Pumps
W tN4C tN4C
Zone 1 Expansion
End Switch
C
Input Power
RR
H8002A
X X
Input Power: 24 V (ac) ±10% 60 Hz
Class 2
Control Load: 11 VA
End Switch: 24 V (ac) 2 A
Pump Relays: 115 V (ac) 5 A
Zone Power: 115 V (ac) 12 A
Made in Canada
tektra 1031-01
Use at least 167°F (75°C) conductors
260
316
070
End Switch (X-X) To Powered Boiler Demand A316-2
24 V (ac)
Transformer 009
tekmarNet
®
4 or conventional Thermostats
Powered Boiler Demand
(ie. Input into tekmar
Boiler Control)
Z1 Z2 Z3 Z4
Z1
Z2
Z3
Z4
tekmarNet
®
4 or conventional
Thermostats