Quick Setup Guide

1 of 2 © 2011 Q 313 - 05/11
tN2 Wiring Center 313
Q 313
05/11
Zoning
Replaces: 11/10
Quick Setup Guide
Location1. Install Junction Box2.
Size Transformer3.
Line Voltage Wiring4.
OR
Zone
1234
Thermostat Load
Zone Valve Load
Control
Load (VA)
Total Zone Load
+ +++
3
Transformer
must exceed:
VA
Power Source
(L, N, Ground)
Zone Group
Pump
(L, N, Ground)
(red)
313
Strip wires 1/2 inch (13 mm).
Installed wires are not removable.
12-18 AWG
Zone Group Pump
Zone Power (L)
313
313
Install Enclosure5.