Application Brochure
7 of 8 © 2010 A132 - 04/10
Mechanical
Electrical
Concept Drawing: This is only a concept drawing, not an engineered drawing. It is not intended to describe a complete system, nor any particular system. It is up to the system designer to determine the necessary components
for and configuration of the particular system being designed, including additional equipment, isolation relays (for loads greater than the control’s specified output ratings), and any safety devices which in the judgement of the
designer are appropriate, in order to properly size, configure and design that system and to ensure compliance with building and safety code requirements.
Application A 132-4
30 Second Delay
2-Stage
Alert per Pump
Alert Levels
Exercising
Off
10 Second Delay
Pump
1 2
Auto
Off
Stand-by
= Required
= Optional
Δ
P
132
Alert
120 V (ac)
P1
P2
F2
Boiler
Sensor
(S1) 071
F1
Outdoor
Sensor (S2) 070
262
No Power
B
B
Alert
A
A
Alert
2
2
Pump
1
1
Pump
L
N
Power
Outdoor
Sensor
Flow
Proof
2-Stage
Demand
Pump
Demand
13 14 15 16 17 18
12
132
10A10A10A10A
F2 P1 P2 A1 A2 D1F1
120 V (ac)
S1
S2
10A10A 10A
262
6 8 10
11 12
Boiler
Demand
Com
Dem
DHW
DemDem
Setp
Power
NL
7 9
P1
Boil DHW
Pmp/Vlv
1
Do not apply power
1516 17 18 19 20 21 22
Com
tN2
tN1 / 10K
Sw
UnO Com DHW
Boil Out
13 14
10A
Stage Stage
122
L
N
123456
78
9
10
11
12345
Boiler 1 Boiler 2
A1 = Alert A
A2 = Alert B
D1 = External Boiler Demand
F1 = Pressure Differential Switch
F2 = Flow Switch
P1 = Pump 1
P2 = Pump 2
S1 = Boiler Sensor 071
S2 = Outdoor Sensor 070








