Instructions / Assembly
Table Of Contents
Contents:
Mirror
X1
Screw
X2
Anchor
X2
3
Vertical 259.4"
Horizontal 155.2"
1 2
Drill two 1/8" pilot holes in wall for each Plate.
Screw the plastic Anchors into the holes until flush.
Screw the screws into Anchors until 1/4" from wall.
Paste the Position map horizontally on the
position to be installed and mark it with a pencil.
MOUNTING TEMPLATE
TEEBARN
MOUNTING INSTRUCTIONS