Operation Manual

9
GB
Shake the base unit for a few moments and then empty it completely into your
sink – fig.21.
To obtain the best result, we recommend that this operation is done twice.
Screw back and tighten up the boiler rinse cap with a coin.
Put the boiler rinse cap cover back in place.
TThhee nneexxtt ttiimmee yyoouu uussee tthhee ggeenneerraattoorr,, hhoolldd ddoowwnn tthhee rreessttaarrtt bbuuttttoonn ttoo ttuurrnn ooffff
tthhee oorraannggee lliigghhtt
fig.12.
Storing your generator
Press the illuminated on/off switch and unplug the generator. Store the
electrical cord in its storage place – fig.22.
Raise the lock-system hoop over the iron until it locks into place (audible click)
fig.2.
Your iron is then safely retained on its base. Warning: do not touch the
soleplate while still hot.
Slot the extension cord outlet in the notch (depending on model). Take the end
of the cord support and press to return the flexible part into the base.
Store the steam cord in its slide storage place. Take it, fold it in two so as to
make a loop. Put the end of this loop in the slide storage place then push gently
until you see the end on the other side of the slide storage place – fig.23.
Leave the iron (and the iron rest) to cool down for 30 minutes.
You can then put your steam generator away, carrying it by the handle – fig.1.
0110566 GV7160 UK 25/05/07 10:17 Page 9
Downloaded from www.Manualslib.com manuals search engine