Instruction Manual

16
www.teejet.com
Fieldware
®
Link 4.02
ABSC enabled – Smartcable or Section Driver
Module setup
Smartcable or Section Driver Module setup is used when a
Smartcable or Section Driver Module (SDM) is on the system. The
boom or delivery area can be entered as up to 15 sections. Each
section can vary in width and in spreader mode, can vary in length.
Additional options available with a SDM include application overlap,
application delay and staggered mode.
NOTE: If a Smartcable or Section Driver Module (SDM) is not
present, refer to “Single section setup” to view setup steps.
Straight implement type
NOTE: When loading this profile type onto a console without
a Smartcable or SDM on the system, only values for
Section 1 will be used. All other section or ABSC information
will be retained in the background as unused parts of the
profile.
Basic properties
►Description – used to enter the name of the machine settings
prole.
►GPS antenna height – used to measure the height of the
antenna from the ground. Range is 0.0 to 10.0 metres.
►Guidance width – used to enter the distance between the
guidelines. Range is 1.0 to 75.0 metres.
►Implement type – used to select Straight as the layout of
the sections for the applied product location.
►Implement offset direction – direction from the centreline
of the machine to the centre of the implement while facing in
the machine’s forward direction
►Implement offset distance – used to enter the distance
from the centreline of the machine to the centre of the
implement. Range is 0 to 10.0 metres.
►Boom offset direction – used to select whether the boom is
located in front of or behind the GPS antenna as the vehicle
moves in a forward direction
►Antenna to boom distance – used to enter the distance
from the GPS antenna to the boom. Range is 0.0 to
50.0 metres.
►Number of implement sections –used to select the number
of implement sections. When ABSC Enabled is checked,
Smartcable and SDM options are available for editing.
►Tank capacity – used to enter the capacity of the tank
►ABSC enabled – used to enable ABSC (automatic boom
section control) options
Unchecked – single section setup options will be available
(see “ABSC enabled – Single Section Setup” section for
details)
Checked – Smartcable or SDM setup options will be
available
Implement dynamics
►Delay on time – used to set the time when each section will
switch on when entering an area that has not been applied. If
the application turns on too soon when entering an unapplied
area, decrease the delay on time. If the application turns
on too late, increase the delay on time. Range is 0 to 10
seconds.
►Delay off time – used to set the time when each section will
switch off when entering an area that has been applied. If the
application turns off too soon when entering an applied area,
decrease the delay off time. If the application turns off too
late, increase the delay off time. Range is 0 to 10 seconds.
►Section width (under Spray width in Matrix Pro v2.xx
or Matrix Pro GS v2.xx, or under Application width in
Matrix Pro GS v3.xx) – used to enter the width of each
section of the implement. Each section can be a different
width. Sections are numbered from left to right while facing
in the machine’s forward direction. Range for each section is
0.0 to 75.0 metres. Total for all sections must be greater than
1.0 metres.
Job specic defaults
►Overlap – used to select the amount of overlap allowed when
the sections are turned on and off while using automatic
boom section control
Figure 37: Basic properties
Figure 38: Implement offset distance and direction