Install Willmar 7200/50 & 7400/50

www.teejet.com
10
FieldPilot
®
1. PREPARE THE FIELDPILOT VALVE
Install adapters (P) in the EF & P ports. Install adapters (R) in the A & B ports. Install adapter (S) in the
T port. Then attach adapters (Q) to (R) in the A & B ports. Finally attach adapter (O) to (P) in the EF port.
Figure 1-4: Prepare the FieldPilot Valve
2. INSTALL THE FIELDPILOT VALVE BRACKET
Locate the two bolts above the axle on the right side next to the mufer. Install the mounting bracket (H)
next to the mufer using the existing bolts.
Figure 1-5: Install Mounting Bracket for FieldPilot Valve
R
P
O
P
S
Q
R
Q
existing bolts