Install Miller 22xx T T-SS T-ET HT Owner's manual
9
FieldPilot
®
98-05232 R0
1. PrePare the FieldPilot ValVe
Install adapters (P) in the P & T ports. Install adapters (M) in the A & B ports. Finally, install adapter (O) in the
LS port.
Figure 1-4: Prepare the FieldPilot Valve
P
M
P
M
O
2. install the FieldPilot ValVe Bracket
Identify valve mounting location. Wrap strap (J) around main cross over beam so that mounting holes are facing
the tank. Next attach bracket (I), so that mounting holes for the FieldPilot valve are facing the tank, to bracket (J)
using (2) (C) 3/8” x 16 x ¾” bolts and (2) (H) 3/8 nuts as depicted.
Figure 1-5: Install Mounting Bracket for FieldPilot Valve
J
I
C & H