Install John Deere 8xxx
www.teejet.com
12
FieldPilot
®
7. INSTALL GPS ANTENNA & CONTROL CONSOLE
The GPS antenna should be mounted on top of the cab as far forward as possible on a metal surface of at
lease 4” square. The control console can be mounted in the cab to preference of the operator.
Figure 1-9: Install GPS Antenna & Control Console
8. INSTALLATION OF ENGAGE/DISENGAGE SWITCH
Connect item (A) to the connector on the SCM harness labeled Remote Engage/Disengage. Install the push
button in a location that is easily accessible during operation of the machine. This switch (A) is not required
if the optional foot switch 32-04020 is used.
Figure 1-10: Engage/Disengage Switch
GPS
Console