Install John Deere 8x00 Owner manual
www.teejet.com
15
FieldPilot
®
8. FIELDPILOT VALVE HOSE CONNECTIONS
The Pressure port of the FieldPilot Valve (D) will be connected to the pressure port on top of the rear tractor
hydraulic block using one hose (K). The T port from the FieldPilot Valve (D) will be connected to the open
tting on the tank return port on the top of the rear tractor hydraulic block using the second hose (K). The LS
port on the FieldPilot Valve (D) will be connected to the open tting at the load sense port on the top of the
rear tractor hydraulic block using hose (L). Refer to the hydraulic diagrams to understand how the FieldPilot
Valve (D) should t in the system.
Figure 1-11: Install FieldPilot Valve Hoses
K
L
9. INSTALL STEERING OUTPUT HOSES
Kit hoses (J) are rst connected to the A and B steering ports on the FieldPilot Valve (D).
Figure 1-12: Install Steering Output Hoses
J