Install John Deere 8x00 Owner manual
www.teejet.com
14
FieldPilot
®
7. PREPARING THE LEFT AND RIGHT STEERING CONNECTIONS
Underneath the tractor, just behind the front differential, nd the left and right steering cylinder hoses and
their connection point to the steel lines from under the cab.
Figure 1-9: Preparing the Left and Right Steering Connections
Uncouple the hoses from the steel lines (be sure to keep track of which hose is connected to which steel
line), and install Run Tees (Q) into the end of the steel lines. Then reattach the steering cylinder hoses to the
other ends of these run tees.
Figure 1-10: Uncouple the Hoses
Q