Install Case 71x0-72x0-89x0 Manual

11
FieldPilot
®
98-05107 R2
5. install steering outPut hoses
Install the steering output hoses (M) onto the run-tees (F) and route adjacent to the tractor rewall down toward
the FieldPilot valve as illustrated. Attach the straight ends of the steering output hoses (M) to the A and B ports
of the FieldPilot valve. Carefully check the hose routing for clearance of sharp edges and securely tighten all
steering output hose ttings both at the run-tees and at the FieldPilot valve.
Figure 1-7: Installing the Steering Output Hose
6. install tractor Pressure and tank Fittings
The two lines emerging from the right side of the steering orbital are the tractor pressure and tank line, stamped
P and T on the castings. Remove the steel line ttings from the steering orbital and install the run-tees (F) as
illustrated. Reattach the steel Tank line tting. The steel Pressure line will be replaced in Step 7. Leave the run-
tees (F) loose to allow for alignment when attaching hoses. Plastic caps placed on the open ends of the adapters
will prevent excessive leakage prior to hose installation.
Figure 1-8: Installing the Tractor Pressure and Tank Fittings
M
Tank
Pressure
F