Install AGCO RoGator 854 (1997-2002) Models User guide
www.teejet.c om
13
FieldPilot
®
8. install leFt and right steer hoses
The steer hoses will connect to run tees installed at the orbital. In step 4 the left and right steer hoses were
disconnected. Now, install run tees (M) on the open ports on the orbital. Connect the 90° end of hoses (I)
to the branch of the run tees and route the hoses to the A and B ports of the FieldPilot Valve. Reconnect the
original steer hoses to the run of the tees.
Figure 1-9: Install Left and Right Steer Hoses
M
M
I
I
J
J
Hose K
Original Steer Hose