Install AgChem 1803 User Manual

www.teejet.com
11
FieldPilot
®
4. PREPARE COUNTERBALANCE VALVE (B) BLOCK
Make sure the valve block is clean and dust free. Work on a clean bench. Remove the plastic plugs and
install the straight ttings (T) in ports C1 and C2. Install the elbow adapter ttings (U) in ports V1 and V2.
Orient the elbow adapters so that they are pointing the opposite direction from the ttings in ports C1 and C2.
Install #8 JIC Run Tee ttings (R) on the straight adapters in ports C1 and C2.
Figure 1-5: Prepare Counterbalance Valve Block
U
U
T, R T, R