TEEJET 744E I n s ta l l ati o n M a n u a l AUTO BOOM SECTION CONTROL for TJ744E with 5 sections
Table of Contents MATRIX with TJ744E SPRAYER CONTROL 1 introduction to tj744E - absc 2 Principle of Operation.............................................................................. 2 Required Parts.......................................................................................... 2 Installing the tj744 absc kit 4 Connecting to Power................................................................................ 4 Battery Cable (Option)..................................................
TJ44E MATRIX™ with TJ744E SPRAYER CONTROL This installation manual covers installation of Matrix with TeeJet 744E Sprayer Control (with 5 sections). We have endeavoured to deliver a fault free product. To ensure optimal use of the equipment, we ask you to pay great attention when reading this manual. Regarding responsibility for use of the product, we refer to our sales and delivery terms especially paragraph 7, which follows: Product usage. 7.1 Any use of the product is at the sole risk of the buyer.
TJ44E introduction to tj744E - absc The Matrix is a combined Guidance and Automatic Boom Section Control (ABSC) device that features control of up to 15 boom sections. The Matrix connects in parallel to the existing wiring loom to the section valves. Principle of Operation The Matrix controls the section valves according to the GPS position as well as the GPS guidance to avoid overlaps or skips. The Matrix controls the section valves in automatic mode.
1008-0224 4 3 1 xxx-xxx xxyyxx A B 2 B A 6 Power/CAN/Data Cable, Matrix TJ744E Sprayer Control, 5 sections Power Cable for TJ744E incl. COBO con. Section Driver Module TJ744E ABSC Cable, 5 sec. TJ744E Harnes for ARAG Manifold, 5 sec. TJ744E Harnes for TJ430 Manifold, 5 sec.
TJ44E Installing the tj744 absc kit Connect the automatic boom section kit as shown on the system overview diagram, Figure 1-1. The kit includes all necessary connectors to get electrical contact with the TJ744E system. Connecting to Power Figure 1-2: Connecting to Power 2 1 - + 1 31 15/30 2 82 Pos. Description 1 +12V (15/30) 2 Ground (31) 1008-0189 Battery Cable (Option) The power supply must be strong enough to operate the valves. The total current will depend on the type of valve used.
TJ44E system check After connecting the power connector, it is time to make a system check. To check the system, it is necessary to have full GPS signal. To obtain full GPS signal, the vehicle must be placed outside. Check AUTO mode: TJ744E Switch box: Section switches should be in the OFF position when working in Automatic mode. The Master switch will control the sprayer and should be ON to enable automatic switching of the sections.
TeeJET 744E I n s ta l l ati o n M a n u a l This installation manual covers installation of Matrix with TeeJet 744E Sprayer Control (with 5 sections). Mølhavevej 2 9440 Aabybro, Denmark Tel: +45 96962500 • Fax: +45 96962501 www.teejet.