User`s manual
ENGLISH
User’s manual 12 UPS EVO DSP PLUS MM
5 Electrical Installation
The electrical installation has to be done by qualified personnel. Follow all the Safety
Standards (CEI Standards in Italy or IEEE elsewhere) for the Input/Output connections
and for the right selection of Input/Output cables.
For safety we recommend using external circuit breakers between Input mains and UPS
AC Input line and between UPS Output lines and the loads. The circuit breakers should
be qualified with leakage current protective function (leakage current < 30 mA).
For the Input/Output connections use ONLY the included power cables or cables with
the same power ratings.
TECNOWARE declines any responsibility if this warning is disregarded.
The EVO DSP PLUS MM models are made of a single unit design that contains the electronic parts and batteries.
Before starting the installation procedure, be sure that:
1. The AC Input Voltage for the UPS has been removed.
2. The UPS is completely OFF (only if graphic LCD panel is OFF).
6.1 Installation
We advise you to follow the steps below explained:
1. Through the included power cable connect the UPS Input socket to the AC line outlet (see figure 4). It is
mandatory to ground the AC line outlet according to the Safety Standards. Carefully check the grounding
of AC line outlet.
2. Connect the devices to be supplied to the UPS outputs, by using only the included cables. Be sure all the
devices have the main switch in OFF position.