Operation Manual
RUNRACE : Service & Maintenance Manual - rev. 2.0
Page 5.2
5.3. FIRST POWER-ON
After completing the installation procedure, the machine is ready to be powered up. To turn on the
machine, simply toggle the on/off switch from the 0 position to the 1 position.
When the machine is turned on it will perform a power-on test which:
• sounds the buzzer;
• lights all the LEDs;
• resets the elevation.
After completing this power-on test the machine enters standby mode, awaiting a keyboard
command.
To check the correct operation of the machine:
• get on the machine;
• press the “Start” key on the keyboard to begin exercising;
• check that the belt motor starts;
• press the “+” and “−” keys on the keyboard and check that the tread belt speed changes
accordingly;
• press the “↑” and “↓” keys on the keyboard and check that the machine elevation changes
accordingly;
• press the emergency button and check that the tread belt stops;
• put on the heart rate transmitter and check that the machine correctly measures the heart rate
value.
Downloaded from www.Manualslib.com manuals search engine










