Use and Care Manual
Step 2c:
Hold the T-Square rmly in place as 
you make your cut to ensure a clean, 
straight edge on the MLV secon.
Step 3 — Hanging MLV
With the help of another person, posion the 
rst  length  of MLV  in  the  top  corner  of  the 
wall. Ensure that the secon of MLV is straight 
and that the cut edge is parallel to the ceiling.  
This will help ensure the seams of addional 
secons remain parallel. 
Also,  do  your  best  to  maintain  an  even  gap 
between the edge of the MLV secon at the 
oor  and  ceiling.  Begin  fastening  the  MLV 
secon every 8”-10” along the top of the wall 
(top plate) before allowing the MLV secon to 
hang freely.
Step 4 — Secure with Fasteners
Aer Securing the MLV secon to the top plate work your way 
around the secon along the underlying studs using the same 
8”-10” gap between fasteners. 
Where secons of MLV bu together on the center of a stud 
place fasteners in each secon at the seam. 
Where secons of MLV meet between studs, overlap them by 
2” and  secure each secon with  fasteners where it is  on top 
of a stud. The loose, overlapping seam will be fastened closed 
with MLV seam tape to nish.
Installaon Steps
2
TECHNOFLEX INTERNATIONAL
Email: sales@technoflexintl.com | Telephone: 888-928-9444
technoflexintl.com






