Use and Care Manual
Step 5 — Cung Outlets
Be sure not to cover electrical outlet
boxes. It’s helpful to expose the outlet
boxes as you install each length of MLV.
Locate the electrical box in the wall
and gently press the MLV against the
box. Using a ulity knife, carefully cut
the opening ghtly to the edges of the
juncon box.
For an even beer sound seal consider
using a puy pad to seal the rear side of
the juncon box.
Step 6 — Cung Overlaps
Prepare the overlapping seams at the boom
and top plate of the wall by cung an L-shaped
notch as pictured. The cut that is parallel to
the oor should be just above the stud wall
boom plate. The cut that is perpendicular
to the oor should be made so that the new
edge bus cleanly to the layer of MLV below
it. Reverse the procedure for making the L-
shaped cut in the secon where it overlaps
at the stud wall top plate. This will ensure the
seam lays at under the drywall applicaon.
Refer to “Dealing with Seams and Overlaps”
for a more detailed explanaon. Repeat steps
1-8 unl your enre wall or ceiling is covered in
Mass Loaded Vinyl.
Installaon Steps
How to Finish Seams and Overlaps - See page 5
refer to Figure 1 refer to Figure 2
refer to Figure 3
3
TECHNOFLEX INTERNATIONAL
Email: sales@technoflexintl.com | Telephone: 888-928-9444
technoflexintl.com