Use and Care Manual

Step 2c:
Hold the T-Square rmly in place as
you make your cut to ensure a clean,
straight edge on the MLV secon.
Step 3 Hanging MLV
With the help of another person, posion the
rst length of MLV in the top corner of the
wall. Ensure that the secon of MLV is straight
and that the cut edge is parallel to the ceiling.
This will help ensure the seams of addional
secons remain parallel.
Also, do your best to maintain an even gap
between the edge of the MLV secon at the
oor and ceiling. Begin fastening the MLV
secon every 8”-10” along the top of the wall
(top plate) before allowing the MLV secon to
hang freely.
Step 4 Secure with Fasteners
Aer Securing the MLV secon to the top plate work your way
around the secon along the underlying studs using the same
8”-10” gap between fasteners.
Where secons of MLV bu together on the center of a stud
place fasteners in each secon at the seam.
Where secons of MLV meet between studs, overlap them by
2” and secure each secon with fasteners where it is on top
of a stud. The loose, overlapping seam will be fastened closed
with MLV seam tape to nish.
Installaon Steps
2
TECHNOFLEX INTERNATIONAL
Email: sales@technoflexintl.com | Telephone: 888-928-9444
technoflexintl.com