
VERIFYING THE RF PLANT WITH THE AIM
Run the EIV Plus Test at the IRD to verify the signal to the
COM46/COM24 card(s)
If there are ANY failures during this test consult the DIRECTV
Appendix A - MDU/Commercial Advantage Validation and
Troubleshooting Procedure to identify and correct the failure.