315-4PN33

1. Open the front flap of your I/O module.
2. Bring the front connector in cabling position.
For this you plug the front connector on the module until it locks.
In this position the front connector juts out of the module and
has no contact yet.
3. De-isolate your wires. If needed, use core end cases.
4. If you want to lead out your cables from the bottom of the
module, start with the cabling from bottom to top, res. from top
to bottom, if the cables should be led out at the top.
5. Bolt also the connection screws of not cabled screw clamps.
6. Put the included cable binder around the cable bundle and the
front connector.
7. Fix the cable binder for the cable bundle.
8. Bolt the fixing screw of the front connector.
9. Now the front connector is electrically connected with your
module.
10. Close the front flap.
11. Fill out the labeling strip to mark the single channels and push
the strip into the front flap.
3.4
Installation guidelines
The installation guidelines contain information about the interference
free deployment of a PLC system. There is the description of the
ways, interference may occur in your PLC, how you can make sure
the electromagnetic compatibility (EMC), and how you manage the
isolation.
40pole screw connec-
tion 392-1AM00
General
VIPA System 300SAssembly and installation guidelines
Installation guidelines
HB140 | CPU | 315-4PN33 | GB | 14-43 22