315-4PN33
2. Choose the connection partner and the type of connection and
confirm with [OK].
ð
If activated, a properties dialog for the according connection
opens as link to your PLC user program.
3. After every connection was configured by this way, you may
save and compile your project and exit NetPro.
Exclusively Siemens S7 connection may be configured with NetPro.
All broadcast stations and All multicast stations are not
supported by this CPU.
n For data transfer with Siemens S7 connections the FB/SFB VIPA
handling blocks are necessary; the deployment is described in the
manual "Operation list" of your CPU.
n At Siemens S7 connections the communication connections are
specified by a connection ID for each communication partner.
n A connection is specified by the local and partner connection end
point.
n At Siemens S7 connections the TSAPs must be congruent cross-
wise. The following parameters define a connection end point:
The following parameters define a connection end point:
Station A Station B
remote TSAP
à
Siemens
S7 connection
à
local TSAP
local TSAP
ß ß
remote TSAP
ID A ID B
Connection types
Siemens S7 connection
VIPA System 300S Deployment Ethernet communication - productive
Configure Siemens S7 connections
HB140 | CPU | 315-4PN33 | GB | 14-43 119