Specifications
8-VSB Agile Modulator Issue 1.02 December 9, 2008 Page 20 of 29
www.technalogix.ca
4.0 INSTALLATION
This section contains installation recommendations, unpacking, inspection, and
installation instructions for the Technalogix TM600-8VSB Modulator. Carefully read all
material in this section prior to installation. Also, read and review the operating
procedures later in this section.
Building Recommendations
The quality of the building is of great importance if you are to expect long life and
continued performance from the modulator. The building must be clean, dry,
temperature controlled and secure. The modulator takes up a single 2-U high space on a
19” rack. Do not forget to allow space in the building for any additional racks to house
test equipment, a workbench area, line regulating transformers, ladders, equipment and
parts storage, first aid kit, emergency generator if used, as well as heating and cooling
devices that may be unique to your installation. A sloping roof will tend to develop leaks
less rapidly. The building should be well roofed with good material. The cooling load will
be lowered with reflective or light colored roofing material.