User Manual
Technalogix Ltd. TM-100 Modulator
12
Unpacking and Inspection
Check the outside of the container. Carefully open the container and remove the
modulator. Retain all packing material that can be reassembled in the event that
the equipment must be returned to the factory.
Exercise care in handling equipment during inspection to prevent
damage due to rough or careless handling.
Visually inspect the enclosure of the modulator for damage that may have
occurred during shipment. Check for evidence of water damage, bent or warped
chassis, loose screws or nuts, or extraneous packing material in connectors.
Inspect all connectors for bent connector pins. If the equipment is damaged, a
claim should be filed with the carrier once the extent of the damage is assessed.
Technalogix cannot stress too strongly the importance of immediate careful
inspection of the equipment and subsequent immediate filing of the necessary
claims against the carrier if necessary. If possible, inspect the equipment in the
presence of the delivery person. If the equipment is damaged, the carrier is your
first area of recourse. If the equipment is damaged and must be returned to the
factory, phone for a return authorization. Claims for loss or damage may not be
withheld from any payment to Technalogix, nor may any payment due be
withheld pending the outcome thereof. Technalogix cannot guarantee the
carrier’s performance.