Installation Instructions

tecspecialty.com
H.B. Fuller Construction Products Inc.
1105 South Frontenac Street
Aurora, IL 60504-6451
TEC
®
744 Solid Vinyl Plank and Tile Adhesive Product Data
©Copyright 2014 H.B. Fuller Construction Products Inc.
TEC
®
and The LiquiDAM
®
are trademarks of
H.B. Fuller Construction Products Inc. DS744 R0214-1
5. INSTALLATION INSTRUCTIONS
Application
For best results, flooring material, room and adhesive should be kept at a
minimum of 70°F (21°C) for 48 hours before and 24 hours after installation.
Refer to flooring manufacturers installation guidelines for proper application
instructions, including trowel size and approximate coverage. TEC
®
744 has an
approximate working time of 2-4 hours, depending on trowel size, floor porosity,
temperature and humidity. Apply adhesive and allow to dry to a tacky, transparent
film - normally 15-45 minutes before applying floor coverings. Keep the adhesive
film free of dust and dirt. After the floor is set, roll in both directions with a
100-150 lb. (45-68 kg) roller to insure good contact with the adhesive. Consult
the flooring manufacturers installation guidelines for specific application
procedures, to insure optimum performance.
Clean-up
Remove fresh adhesive from face of flooring with warm, soapy water. Dried
adhesive must be removed with mineral spirits.
6. AVAILABILITY
TEC
®
Premium Tile and Stone Installation Products are available nationwide.
To locate TEC
®
products in your area, please contact:
Phone: 800-832-9002
Website: tecspecialty.com
7. WARRANTY
For warranty details, see your sales associate or tecspecialty.com.
8. MAINTENANCE
Not applicable
9. TECHNICAL SERVICES
Technical assistance
Information is available by calling the Technical Support Hotline.
Toll Free: 800-832-9023
Fax: 630-952-1235
Technical and safety literature
To acquire technical and safety literature, please visit our website at
tecspecialty.com.
10. FILING SYSTEM
Division 9