How to Guide
5. INSTALLATION INSTRUCTIONS
Surface Preparation
Remove all surface contaminates such as oil, grease, floor
finishes, wax and dirt. Remove adhesive by scraping until all that
remains is a thin, transparent layer of adhesive residue.
For detailed substrate preparation information, refer to the
appropriate TEC Skill Set surface preparation product data
sheet.
Instructions for Mixing
For best results, room and product should be kept at 50° to 70°F
(10° to 21°C) for 24 hours before, during and 48 hours after
application. Mix TEC Skill Set Self-Leveling Underlayment
Primer in the ratios listed in the coverage chart.
Application
Use a paint brush, short nap roller or a soft push broom to apply
in an even, continuous film. Do not allow product to puddle.
Dry Time
TEC Skill Set Self-Leveling Underlayment Primer typically dries
in 30 minutes to 3 hours and is transparent in color when dry.
Cure times are based on 70°F (21°C) and 50% RH. For full
strength roller applications, dry times are 30-60 minutes. Colder
temperatures and higher humidity will extend cure times. Avoid
excessive foot traffic and surface contamination.
Clean-up
Clean tools, hands and excess material immediately with water.
Material that is cured is difficult to remove.
6. WARRANTY
For details about our limited warranties, see your sales associate
or tecskillset.com.
7. TECHNICAL SERVICES
Technical Assistance
Information is available by calling the Technical Service Helpline.
Toll Free: 800-832-9023
Fax: 630-952-1235
Technical and Safety Literature
To acquire technical and safety literature, please visit our website at
tecskillset.com.
SELF- LEVELING UNDERLAYMENT PRIMER
Printed in U.S.A
©2013 H.B. Fuller Construction Products Inc.
Form # TSSMPP R1014-16
1105 South Frontenac Street
Aurora, IL 60504-6451 U.S.A.
tecskillset.com
TEC and Skill Set are trademarks of H.B. Fuller
Construction Products Inc.