How to Guide

Waterproofing and Crack Prevention Membrane
4. TECHNICAL DATA
Applicable Standard
TEC® Skill Set™ Waterproofing and Crack Prevention Membrane
ANS A118.10
Requirement
Typical Results
50 psi (.34 MPa)
160 psi (1.09 MPa)
50 psi (.34 MPa)
105 psi (0.72 MPa)
50 psi (.34 MPa)
180 psi (1.23 MPa)
50 psi (.34 MPa)
200 psi (1.37 MPa)
50 psi (.34 MPa)
220 psi (1.50 MPa)
Shall not support
mold growth
Passes
8 lb./inch width
8.1 lb./inch width
Min. 170 psi (1.17
MPa)
200 psi (1.37 MPa)
Max. 0.7% length
change
< 0.4% length
change
Tested in accordance with
American Standards for Load
Bearing, Bonded, Waterproof
Membranes for Thin Set
Ceramic Tile and Dimension
Stone Installation ANSI
A118.10
No visible water
penetration after 48
hours
Passes
ANSI A118.12
Requirements
Typical Results
Min. 1000 lb. load
without cracking tile
Passes
Standard
Performance Min.
1/16”
High Performance
Min. 1/8”
High Performance
Standard
Performance Min.
1/16”
High Performance
Min. 1/8”
High Performance
Test Method
Typical Results
ASTM D-5590
Passed with no
growth and 10 mm
zone of inhibition.
ASTM D-751
1400%
ASTM D-751
95 psi (0.65 MPa)
Physical Properties
Description
Physical State
Liquid: Styrene Butadiene
Rubber Emulsion
Waterproofing Mesh: Non-
hazardous Fibrous Mesh
Color cured
Yellow
Odor
Cured: None
Tile Installation
Time 3-4 hours after
membrane application. See
CURING [at 70ºF (21ºC)]
section for more information
Foot Traffic Rating (ASTM
C627)
Residential to Extra Heavy
Commercial (depending on
substrate)
Service Temperature Rating
-20ºF (-29ºC) to 320ºF (160ºC)
VOC
6.1 g/L
VOC (less water)
9.56 g/L
Freeze/thaw Stability of Liquid
1 cycle
5. INSTALLATION INSTRUCTIONS
Mesh Application (Flashing)
Flashing with TEC
®
Skill Set™ Waterproofing Mesh for common
problem areas like; inside corners, outside corners, anywhere
vertical surfaces meet horizontal surfaces; or anywhere dissimilar
materials meet is optional.
To accomplish flashing, first pre-coat the substrate intersections 4"
on each side. Then fully embed the 6" wide waterproofing mesh in
both directions into the pre-coated areas with a 3" overlap on each
side. Allow to dry (approximately 30 to 45 minutes) before full
application of membrane.
Membrane Application
Clean substrate from dust with a damp sponge and install
membrane right away. For crack isolation apply one coat 50 mils
thick. For waterproofing installations, membrane must be applied in
two 25 mils thick coats over the entire surface. Using a 1/4-1/2 nap
roller or 3/16 x 5/32
V-notch trowel, apply a continuous, even film
with overlapping strokes. Make sure there are no voids, bubbles or
breaks in the membrane after cured. Apply first coat at 25 mils wet
thickness measuring periodically with a wet film thickness gage. Let
it dry for 1 hour. Apply a second 25 mils thick coat at right angle to
the first in order to fill the imperfections and pinholes. If trowel used,
smooth out the membrane ridges with a flat side of the trowel
immediately after the application.