How to Guide
For installation over acceptable adhesive residue, remove adhesive
by scraping until all that remains is a thin transparent layer of
adhesive. Concrete and cementitious substrates must be fully cured
and free of any hydrostatic pressure or excessive moisture. All
surface protrusions must be removed by sanding, scrapping or
chipping. Substrate temperature should be a minimum of 43ºF (6ºC)
during application and air temperature maintained above 50ºF
(10ºC). DO NOT cover existing building expansion or control
joints. Remove all dust by vacuuming. Not recommended for use
over expansion or control joints.
TEC
®
Skill Set™ Skimcoat and Patch can be installed over new or
moist concrete with RH of 95% or 15 lbs. per 1,000 sq. ft. per 24
hours. For moisture sensitive floor coverings refer to the finished
floor manufacturer’s specifications on moisture limitations.
Instructions for Mixing
Mix only as much TEC
®
Skill Set™ Skimcoat and Patch as can be
used in 10-15 minutes. For best results, maintain all tiling materials,
substrates, room and adhesives at 50º-70ºF (10-21ºC) for 24 hours
before and 48 hours after installation. Avoid breathing dust and
contact with eyes and skin. Avoid using high speed mixing, not to
exceed 300 rmp, to prevent entraining air. Add powder to liquid for
ease of mixing.
In a clean mixing container, slowly add product to clean, cool, water
as specified in the chart below.
Size
Water
10 lbs.
1.2 - 1.6 quarts
25 lbs.
3 - 4 quarts
Mix material for 2 minutes to a smooth, lump-free consistency.
For smaller amounts use a ratio of 3 parts powder to 1 part
water. Use immediately.
Application
Immediately after mixing, work TEC® Skill Set™ Skimcoat &
Patch into the void to be filled with a flat steel trowel and then
finish to a level surface to the required smoothness. The working
time for this product is 10-15 minutes depending upon the
temperature. For repairs greater than 1/2” in thickness, you will
need two applications, allowing the first application to set before
applying the second. Do not exceed a total thickness of 1”. Do not
overwork the product.
Dry Time
TEC
®
Skill Set™ Skimcoat and Patch is fast drying and can accept
foot traffic and the installation of most floor covering materials within
30-45 minutes. Protect from excessive heat or drafty conditions
during curing period.
Skimcoat and Patch
Printed in U.S.A
©2013 H.B. Fuller Construction Products Inc.
Form # TSSMPP R1014-16
1105 South Frontenac Street
Aurora, IL 60504-6451 U.S.A.
tecskillset.com
TEC and Skill Set are trademarks of H.B. Fuller
Construction Products Inc.
Clean-up
Wash tools, hands and equipment with warm soapy water while
material is still fresh.
6. WARRANTY
For details about our limited warranties, see your sales associate
or tecskillset.com.
7. TECHNICAL SERVICES
Technical Assistance
Information is available by calling the Technical Service Helpline.
Toll Free: 800-832-9023
Fax: 630-952-1235
Technical and Safety Literature
To acquire technical and safety literature, please visit our website at
tecskillset.com.