Manual

9
7) Remove CT shorting bars
Press “Stop” to turn off unit
Disconnect power from cabinet
o Turn off the built in door breaker AND
o Turn off the upstream feeder breaker
Open the cabinet door and remove shorting bars
from CTs connected to TB-1
Warning
Lethal voltages may be present. Wait 5
minutes for DC bus voltage to drop to
safe levels.
Warning
Check for voltage in cabinet with a
DMM before working inside cabinet.
8) Current polarity - 1
Power up unit
From Home screen press “Run” to turn on unit
Press “Status” to navigate to Status screen
Select “Vline/Iline” screen
Note: Lightly loaded conditions (less than 20% CT
rating) will not have enough current to
show up on Iline plot
Check that Phase A to Neutral voltage peak lines
up with Phase A current (use zoom if necessary)
Check that Phase C to Neutral voltage peak lines
up with Phase C current
Power system down and check CT installation
location and orientation if Phase A plots differ
significantly from Phase C plots
Warning
Improper operation and damage may
occur if CTs are installed incorrectly.
9) Current Polarity – 2
Navigate to Status screen
Navigate to Line/Load status
Verify that “Volts,” “Current,” “Power,” “I THD,"
and “V THD” match expected values for the
power system
If they do not, verify CTs are correctly installed
Warning
Improper operation and damage may
occur if CTs are installed incorrectly.