Tus neeg siv phau ntawv

Yingkou Tiancheng Fire Protection Equipment Co., LTD
The schematic diagram of the base of the detector is shown in Figure 3. Fix the base with two self-tapping screws
or stick it firmly with 3M glue. After the base is firmly installed, align the bottom of the detector and rotate the
base clockwise to install the detector on the base.
Fig.3 Schematic diagram of the base of the detector