Integration Manual

Table Of Contents
TOBY-L3 series - System Integration Manual
TSD-19090601 - R13 System Integration Manual Page 24 of 143
Power off
Connected
Sleep
Active
Booting
Apply VCC
power supply
Switch OFF:
1). AT+CPWROFF
2). RESET_N (hardware reset)
3). Low pulse on PWR_ON
Boot up
finished
Incoming/outgoing call or
other dedicated device
network communication
No LTE/3G/2G data connection
in progress, Call terminated,
communication dropped
Any wake up event described
in the module operating
modes summary table above
If power saving is enabled
and there is no activity for
a defined time interval
Not powered
Remove VCC
power supply
Switch ON:
1). PWR_ON
Download
Firmware
Download
Boot With Recovery
Switch ON with the
Pin TX2 pull up to high
Figure 2: TOBY-L3 series operating modes transition