User's Manual

TUNet Single Phase Retrofit Guide
P/N 900-0006 Proprietary and Confidential
11
11. Power for the TC-1210 is taken directly off the GE I-210 meter base. Remove the red wire from the fast tab
connector on the meter base.
12. Install a Y connector on the fast tab mount as depicted in the sequence below.
Figure 12: Example ‘Y’ Fast Tab Connector
13. Reconnect the power lead from the I-210 module to one of the leads on the ‘Y’ connector.
14. Connect the power lead from the TC-1210 module to the other lead on the ‘Y’ connector.
15. Repeat steps 2-4 for the fast tab with the green wire connected to it.
16. The final configuration will have two new ‘Y’ connectors installed on the meter base. Figure 13 depicts the final
configuration for the power leads.
Figure 13: Final Power Lead Configuration
17. With the power connections complete, connect the IR serial interface to the mating connector on the TC-1210 meter
module. Take care to align the mating keys on the connector to the slots on the socket.
18. The base and the display portion will need to be tilted towards each other in order to allow the IR serial interface
connection to be made.
19. The display portion can now be mated to the base. Install the clear polycarbonate or glass cover.