User's Manual
8
2. Attach the connector of the IR serial interface to the mating connector on the TC-2200
module.
3. Position the module over the mounting posts on the meter.
4. Position the nameplate over the module.
5. Using the appropriate ¾” mounting screws, secure the module to the mounting posts
taking care not to interfere with the meter disk.
The module is now ready for initial programming.
Program the TC-2200 Module
Before placing the meter and module into service, the module must be programmed with initial
operating parameters. Refer to the Guide to Programming Tantalus UTG Meter Modules.
1. Using the software provided, program the module with the following minimum
parameters:
• Meter serial number or utility identification number
• Meter Kh constant
• Tantalus assigned Utility Business ID
• Initial kWh (meter face) reading
• Initial AMR reporting interval
• Additional parameters which may be programmed include power outage reporting and
PQM parameters:
• Blink period threshold
• Swell and Sag alarm voltage threshold and time threshold
• Initial PQM reporting interval
• After the TC-2200 module is programmed replace the glass cover. The meter is ready for
final calibration and service.
Final Calibration
Prior to placing the meter into service, you must calibrate and seal it.