User's Manual

4
Installing the TC-2200
BEFORE YOU BEGIN
1. Assemble the necessary equipment: Tantalus TC-2200 Module Installation Kit and
required tools and materials.
TC- 2200 MODULE INSTALLATION KIT
Each kit for installing a Tantalus TC-2200 module includes the following items:
One TC-2200 module
One IR serial interface
In addition to the retrofit kit the following items are required:
Mounting screws for GE I-70-S meter: UNF 4-48 x ¾” (Two required per meter)
Mounting screws for ABB AB-1 meter: UNF 6-40 x ¾” (Two required per meter)
Power clips to attach to bus bars (Two required per meter): Part number dependant on
bus bar diameter.
Tantalus P/N Bus Bar Diameter
13811300003A 0.20” 0.22”
13811300003B 0.18”
13811300003C 0.26” 0.28”
13811300003D 0.32” 0.36”
REQUIRED TOOLS AND MATERIALS
3/8” electric hand drill and 3/8” drill bit
Drill alignment jig (recommended for GE meters)
Needle nose pliers
#2 Phillips screwdriver
Rubbing alcohol
Soft cloth or paper towels
Disk marking template and paint pen
Anti-static wrist strap
Computer for programming TC-2200 module (Desktop, laptop or handheld
computer)
Tantalus TC-2200 module programming software
DC power supply, 6 8 VDC, for powering the module for programming
TC-2200 Programming Cable