User's Manual
6
correct channel.
INSTALL METER
10. Once full two-way communication is verified, install the meter equipped with a TC-2200
into the meter socket of the RT-2200.
VERIFY CONNECTION BETWEEN RT- 2200 AND TC- 2200
11. Make sure the TC-2200 powers up to full two-way communication by checking the LED
indicator.
IF THEN
The TC-2200 does not power up (ie: the
LED does not turn on).
Remove the TC-2200 equipped meter
and use another unit.
The TC-2200 powers up but does not
appear to establish communications with
the RT-2200.
Remove the TC-2200 equipped meter
and use another unit.
COMPLETE THE INSTALLATION
12. Once communication between the TC and RT units is established, install a meter ring and
seal to secure the meter to the RT-2200 unit.