User manual
Table Of Contents
- 1. About This Manual
- 2. General Information
- 3. Installation
- 3.1 Performing the Installation
- Step 1. Unpacking the StorageLoader
- Step 2. Installing the StorageLoader in a Rack
- Installing the Rack Mounting Kit
- Installing the “Rail Left Assembly”
- Installing the “Rail Right Assembly”
- Mounting the StorageLoader to the Rack
- How to dismount the StorageLoader from the rack
- Step 3. Connecting Power Cable
- Step 4. Removing the Transport Lock
- Step 5. Running Power-On Selftest
- Step 6. Setting the SCSI Address
- Step 7. Connecting the SCSI Bus Cable
- Step 8. Connecting the Ethernet Connector
- Step 9. Restarting Your System
- Step 10. BCR: Labelling of cartridges
- Step 1. Unpacking the StorageLoader
- 3.1 Performing the Installation
- 4. Operation and Configuration
- 1.
- 5. Remote Management
- 6. Maintenance
- 7. Troubleshooting
- Appendix A – Specifications
- Appendix B – Spare parts/Accessories
- Appendix C – Field Replacement Units (FRUs)

Tandberg Data Maintenance
5. Turn the main power off at the back of the loader.
6. Remove the magazine and insert the locking screw. The red plastic tab shall
protrude from the front of the loader.
7. Insert the magazine and push it in till it locks in place.
6.5 Field Replaceable Units (FRUs)
Tape drives, magazines, power supply, fans and dust filters are Field Replaceable
Units (FRUs), see figure below. They can easily be removed/replaced for quick field
service while the loader is mounted in a rack, see Appendix C.
Figure 6.2 Field Replaceable Units
StorageLoader Installation and User Manual 51