User manual
Table Of Contents
- 1. About This Manual
- 2. General Information
- 3. Installation
- 3.1 Performing the Installation
- Step 1. Unpacking the StorageLoader
- Step 2. Installing the StorageLoader in a Rack
- Installing the Rack Mounting Kit
- Installing the “Rail Left Assembly”
- Installing the “Rail Right Assembly”
- Mounting the StorageLoader to the Rack
- How to dismount the StorageLoader from the rack
- Step 3. Connecting Power Cable
- Step 4. Removing the Transport Lock
- Step 5. Running Power-On Selftest
- Step 6. Setting the SCSI Address
- Step 7. Connecting the SCSI Bus Cable
- Step 8. Connecting the Ethernet Connector
- Step 9. Restarting Your System
- Step 10. BCR: Labelling of cartridges
- Step 1. Unpacking the StorageLoader
- 3.1 Performing the Installation
- 4. Operation and Configuration
- 1.
- 5. Remote Management
- 6. Maintenance
- 7. Troubleshooting
- Appendix A – Specifications
- Appendix B – Spare parts/Accessories
- Appendix C – Field Replacement Units (FRUs)

Tandberg Data Operation and Configuration
- 1 SCSI Terminator.
- 1 Ethernet cable
- Tool for Emergency Magazine Release
- 30 StorageLoader specific Bar code labels
There will be variations of this list.
Note: The StorageLoader contains no cartridges before shipment.
Step 2. Installing the StorageLoader in a Rack
The StorageLoader is designed for use in 19” rack system using 1U of rack space.
The length of the power cord and the SCSI cable may restrict the placement.
Attention: The StorageLoader is designed to operate in a horizontal position. Do
not attempt to operate the StorageLoader in any other position than horizontally.
Also make sure that:
• The airflow around the front and back of the StorageLoader is not
obstructed.
• There is a minimum of 60cm free space in front of the unit to allow the
operator to safely remove the magazines.
• The display and operator controls are easily accessed.
• The StorageLoader is away from the floor, and in a clean environment with
temperature within specification, see Appendix A.
The Rack Mounting Kit includes the following items:
• Rail Left Assembly
• Rail Right Assembly
• Screw M6x12 (6 pieces)
• Screw M5x8 (2 pieces)
Recommended mounting tools:
• Folding rule or tape measure
• Screwdriver
• 7 mm open-end wrench
Note: The rails are mounted to the loader during transportation. Before mounting
12 StorageLoader Installation and User Manual