Instructions
tams elektronik
PZS-2 English
8.4. Connecting the shuttle-train section to the PZS-2
You must make at least the following connections (marked grey in the
list):
Supplying transformer for the PZS-2 (s. section 8.3)
Driving transformer (s. section 8.3)
Terminus station 1 and 2
The other connections should be made only if required.
Connecting the shuttle-train section
N.B: The specifications "right" and "left" refer to the
direction of travel"way there".
left right cutting
points
Terminus station 1 9 6 D
Terminus station 2 5 18 B
Stop 1 and stop 2 16 17 A, C
Stop 1 only (without stop 2) --- 17 A
Stop 2 only (without stop 1) 16 --- C
Additional connections
Points at terminus station 2
In case you do not use stop-points you should connect an
extra bistabile relais to the points (not included in the
package). See section "Connecting points".
return line: 2
switching contacts:
7,8
Switching input "prolonging the halting time" 13, earth: 4
Switching input "extra halts" 12, earth: 4
Programming input "save" 14, earth: 4
Programming input "select" 15, earth: 4
Page 27