Side of Pole Mount Foundation Recommendation Addendum 02
Installation Manual Side of Pole Add. 02 Foundation Recommendation Addendum Note: The suggestions below are recommendations only. It is the installer’s responsibility to validate foundation parameters prior to installation, as a local geotechnical report may be required to assess ground conditions. We recommend consulting with a local engineer familiar with local regulations and build site requirements, including soil conditions, terrain and load criteria (wind, snow, seismic).
Installation Manual Side of Pole Add. 02 Installation Recommendations Auger hole to minimum depth shown in Table 2 6” of hole should be filled with crushed rock or a blocking. This will prevent the pipe from touching the base of the hole, insuring complete encapsulation of the pipe when concrete is poured, as well as allowing for water drainage. See Fig. 1 Pipe should be installed vertically no matter the slope of the install site.