User's Manual
Table Of Contents
- Installation and Operation Manual Draft in Progress
- Contents
- Preface
- 1 Description
- 2 General Safety and Regulatory Information
- 3 Operation
- 4 Working with Base Stations from Your PC
- 4.1 PC Recommendations
- 4.2 Connecting Your PC to the Base Station
- 4.3 Working with the Web Interface
- 4.4 Basic Tasks
- 4.4.1 User Settings
- 4.4.2 Taking the Base Station Offline
- 4.4.3 Troubleshooting Alarms
- 4.4.4 Working with Configuration Files
- 4.4.5 Configuring Single Base Stations
- 4.4.6 Configuring Base Stations in a Channel Group
- 4.4.7 Setting Up Custom Alarms
- 4.4.8 Disabling the Front Panel Keypad
- 4.4.9 Preparing to Download Firmware
- 5 Installation
- 6 Maintenance
- 7 Troubleshooting
- 8 Replacing Modules
- Appendix A – Interface Pin Allocations
- Appendix B – Inter-Module Connections
- TaitNet P25 Glossary
- Tait Software License Agreement
DRAFT 4
14 Description TB9400 Installation and Operation Manual
© Tait Electronics Limited September 2011
1.3 Mechanical Assembly
This section illustrates the main mechanical components of the base station.
Figure 1.1 below shows the configuration for a typical dual 50 W base
station. The PMU occupies the slot at the left end of the subrack, with the
reciter and PA pairs to the right of it. Each PA is mounted vertically with its
heatsink facing its associated reciter. The PMU and each reciter/PA pair
have their own cooling fans.
The front panel can be easily removed from the subrack by undoing two
quick-release fasteners. Refer to “Replacing Modules” on page 93 for more
details.
.
Figure 1.1 Mechanical assembly - dual 50 W base station with front panel
b front panel i reciter 1
c subrack j module retaining clamp
d PMU 1) subrack interconnect board
e PA 2 1! plastic guide rail
f reciter 2 1@ subrack interconnect board retaining clamp
g cable retaining clip 1# front panel fastener
h PA 1
b
c
d
e
f
g
h
i
j
1)
1!
1@
1#